Sub Sections:
1
2
3
4
5
6
7
8
9
10
11
12
Pages:
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Micro Piles |
Pressure Grouting |
Rock Anchors |
Permeation Grouting
Soil Nailing |
Compaction Grouting |
Micropiles |
Injection Grouting |
Chemical Grouting
Our
techniques apply when adding new structures:
especially
rock anchor,
microfine cement,
soil nailing,
micropile
installations for
foundation support.
We
specialize in
slope stabilization,
anchors,
permeation grouting,
foundation repair
and support,
grouting,
soil nails,
rock drilling,
micropile installations, and
sinkholes. We
use a
problem-solving approach geotechnical
architecture of buildings, bridges,
water plants, sewage plants, tunnels,
sinkholes,
caisson,
shoring,
underpinning,
agriculture, and
roads
construction. We
are experienced in these applications:
micro piles,
sinkhole repair,
permeation grouting, pressure
grout,
soil nails,
chemical grouting,
micropiles,
compaction grout, and
rock anchors.
Our specialties are
rock anchor,
acrylamide and
compaction grouting,
mini piles,
sinkhole repair,
micropiles,
acrylamide grouting, and
soil nailing.
We will continue to
dedicate ourselves to
excellence,
including
insurance mortgage, in our performance, in our
integrity, and in our relationships with our
customers. We will carefully weigh our
decisions, actions, and results to make sure
that we remain the most trusted name in the
geotechnical contracting industry. Please
visit our website
http://www.rembco.com/.
Add Concrete Construction URL
|

Contract Administration
JULY
1997
3-3
should be presented at the pre-construction conference(s) to be held with the Contractor
and other interested agencies.
Pre-construction conferences are usually held at about the time the Contractor begins
mobilizing at the site, but well before work actually starts on the job. Four general subjects
are normally covered: (1) safety, (2) labor compliance and affirmative action, (3) utilities,
and (4) matters related to the performance of the work itself. Depending on District policy
and the complexity of the project, very often more than one meeting is desirable in order to
limit the scope and the number of individuals present. From this meeting should come a
common understanding of the proposed work and the problems and possible solutions
which may be expected during the life of the contract.
The pre-construction conference presents an excellent time to focus on inherent project
problems and specifications which could have significant impacts on the Contractor’s
operations. Since contracts vary and many specifications govern foundation work, it is
impossible to list all of the items which might apply. However, the following list covers some
of the areas which should be considered:
ITEM
REFERENCE
Test Boring Information Standard Specifications, Section 2-1.03
Excavation Plans
Standard Specifications, Sections 5-1.02A & 7-1.01E
Differing Site Condition Standard Specifications, Section 5-1.116
Source of Materials Standard Specifications, Section 6-1.01
Sound Control Requirements Standard Specifications, Section7-1.01I
Water Pollution
Standard Specifications, Section7-1.01G
Public Safety
Standard Specifications, Section 7-1.09
Preservation of Property Standard Specifications, Section 7-1.11
Responsibility for Damage Standard Specifications, Section 7-1.12
Protection of Utilities Standard Specifications, Section 8-1.10
Cofferdams
Standard Specifications, Section 19-3.03
Foundation Treatment Standard Specifications, Section 19-3.04
Foundation Inspection Standard Specifications, Section 19-3.05
Foundation Revisions Standard Specifications, Sections 19-3.07 & 51-1.03
Piling
Standard Specifications, Section 49
Seal Course
Standard Specifications, Section 51-1.10
Special Concrete Mix Designs Special Provisions
Applicable Caltrans Policies Various Manuals
Hazardous Waste Material —