Diaphragm Wall or
Sheet Pile Wall
1
Monitor load applied to wall.
2
Monitor draw-down due to seepage or dewatering to predict
settlement of adjacent structures.
3
Measure uplift to determine stability of base.
Retaining Wall
q
Monitor load applied to wall.
Piezometers
EXC-p1.cdr
Drains
Boxes indicate typical locations for piezometers. Numbers refer to functions listed below.
RETW-p1.cdr
Drain
Rembco Geotechnical Contractors specializes in slope stabilization, soil nail wall, foundation repair and support, grouting, shoring, micropile construction, rock drilling, and we remediate sinkholes. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, installing caisson bottom, and roads. We are experienced in these applications: micro piles, sinkhole repair, permeation and pressure grouting, soil nails, cement grouting, chemical grouting, micropiles, compaction grouting, and rock anchors. Rembco techniques apply when adding new structures: especially rock anchor, microfine cement, soil nailing, and micropile installations for foundation support. Our specialties are soil nails, rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing.
Micro Piles  |  Pressure Grouting  |  Rock Anchors  |  Permeation Grouting  |  Sinkholes   |  Add URL Construction, Concrete
Soil Nailing  |  Grout Compaction Grouting  |  Micropiles  |  Chemical Grouting


Pages - First Set: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86