Vertical Beam Sensors
1
Slip mounting bracket and housing onto beam. See illustrations
for proper orientation of housing.
2
Drill anchor holes. Fill the hole with grout, then insert anchor
stud. Allow grout to harden.
3
Install signal cable and conduit.
4
Bolt angle-brackets onto stud as shown in drawing.
5
Bolt end-brackets of beam to angle brackets. Check that end
brackets are loose enough to allow adjustment.
6
Zero the sensor using EL-35 readout, then tighten thumb wheels.
Beam Sensors and Tiltmeters
Swivel Plate
Sensor Housing
(side view)
Mounting
Bracket
Angle Bracket
End Bracket
Beam
E LV BM- 2 .c d r
Vertical Beam
(Looking Directly at Wall)
Swivel Plate
Sensor Housing
(front)
Minimum
90mm
Angle Bracket
End Bracket
E LVB M-1 . cd r
(Looking Along Wall)
Vertical Beam
Structure
Wall
Rembco Geotechnical Contractors specializes in
slope stabilization,
soil nail wall,
foundation repair
and support,
grouting,
shoring,
micropile
construction,
rock drilling, and we remediate
sinkholes. We use a
problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels,
installing caisson bottom, and roads. We are experienced in these applications:
micro piles,
sinkhole repair,
permeation and
pressure
grouting,
soil nails,
cement grouting,
chemical grouting,
micropiles,
compaction grouting, and
rock anchors.
Rembco techniques apply when adding new structures: especially
rock anchor,
microfine cement,
soil nailing, and
micropile
installations for foundation support. Our specialties are
soil nails,
rock anchor,
chemical and
compaction grouting,
mini piles,
sinkhole repair,
micropiles, and
soil nailing.