Installation
Horizontal Inclinometers
1
Excavate trench with small gradient (0.5%) for drainage. Bottom
of trench should be flat. Place and compact 100 mm layer of sand
in trench. Lay assembled casing in trench. Orient casing so one
set of grooves is vertical.
2
Cover casing with 100 mm of sand. Compact evenly.
3
Backfill remainder of trench with select fill. Compact evenly.
Obtain datum readings, then hand over to client.
EL Horizontal In-Place Inclinometers
Inclinometer casing is installed in a horizontal borehole, buried in a
trench, or attached to a structure.
1
Install casing as above.
2
Position the string of EL sensors inside the casing. Sensors are
connected by a signal cable.
3
Connect readout and obtain a datum reading.
Rembco Geotechnical Contractors specializes in
slope stabilization,
soil nail wall,
foundation repair
and support,
grouting,
shoring,
micropile
construction,
rock drilling, and we remediate
sinkholes. We use a
problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels,
installing caisson bottom, and roads. We are experienced in these applications:
micro piles,
sinkhole repair,
permeation and
pressure
grouting,
soil nails,
cement grouting,
chemical grouting,
micropiles,
compaction grouting, and
rock anchors.
Rembco techniques apply when adding new structures: especially
rock anchor,
microfine cement,
soil nailing, and
micropile
installations for foundation support. Our specialties are
soil nails,
rock anchor,
chemical and
compaction grouting,
mini piles,
sinkhole repair,
micropiles, and
soil nailing.