Installation of VWP Spot-Weldable Strain Gauge
1
Prepare surface: Remove rust with sander. If necessary, create a
flat surface with grinder. Check that surface is clean.
2
Weld gauge to surface, as shown in drawing. Hold insulating card
between welding tip and tube to prevent welding damage.
3
Apply corrosion protection to gauge (3M Scotch Kote).
4
Mount strain gauge sensor on top of strain gauge. If the gauge is
on rebar, use plastic tie-wraps to secure sensor. Then wrap mastic
pad around sensor and gauge. Finally, wrap self-vulcanizing tape
over the entire assembly.
If gauge is on beam, place tie-down straps over sensor and weld
to beam. Do not allow contact between welder tip and sensor.
Weld protective cover over installation. Fit mastic pad over pro-
tective cover and exit point of cable.
Strain Gauges
Start Welds in Center, Work Toward End.
Place Insulating Card Between Tube and
Welder Tip to Protect Tube.
3rd Row
2nd Row
1st Row
.05"
(3 Rows Per Side)
0.1"
V WGA U GE .c dr
Note: Spot Weld as Close
to Ends as Possible.
Courtesy of: Slope Indicator Company
Rembco Geotechnical Contractors specializes in slope stabilization, soil nail wall, foundation repair and support, grouting, shoring, micropile construction, rock drilling, and we remediate sinkholes. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, installing caisson bottom, and roads. We are experienced in these applications: micro piles, sinkhole repair, permeation and pressure grouting, soil nails, cement grouting, chemical grouting, micropiles, compaction grouting, and rock anchors. Rembco techniques apply when adding new structures: especially rock anchor, microfine cement, soil nailing, and micropile installations for foundation support. Our specialties are soil nails, rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing.
Micro Piles  |  Pressure Grouting  |  Rock Anchors  |  Permeation Grouting  |  Sinkholes   |  Add URL Construction, Concrete
Soil Nailing  |  Grout Compaction Grouting  |  Micropiles  |  Chemical Grouting


Pages - Second Set: 85 86 87 88 89 90 91 92 93/a> 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170