MicropileSECTION 01000
SPECIAL PROVISIONS
1. Notice of Starting Work
The Contractor shall notify the Engineer in writing forty-eight (48) hours before starting work at the project site. In case of a temporary suspension of work, he shall give reasonable notice before resuming work.
2. Records of Employees
The Contractor shall keep an accurate record showing the name, place of residence, citizenship and per diem pay, of each person engaged in the execution of the contract; and he shall cause every subcontractor under him, who shall undertake the performance of any part of the contract, to also keep a similar record of each person engaged in the execution of said subcontract. All such records shall be available at any time to the Owner or his duly authorized Representative.
3. Archeological Finds
Not withstanding anything to the contrary herein, in the event any archaeological artifacts within the project are discovered during the course of the work, the Owner shall have and retain all right, title, and interest to such artifacts and shall have the further right, during the course of the contract to examine, or cause to have examined, the site of the work for any such artifacts and to perform or have performed archeological excavations and all other related work to explore for, discover, recover, and remove such artifacts from the site of the work. In the event the archeological examination and related work delays the Contractor's work, he shall be entitled to an extension of time to complete the work equal to the number of days he is thus delayed.
Patch Pavement Requirements
All patch pavement required for the lining of the existing mains except for those listed on the pavement schedule are to be merged into the total cost, no additional payment will be allowed. All payment replacement shall meet or exceed Metro and State pavement specifications.
END OF SECTION
|
This Section:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Sections: 1 2 3 4 6 7 8 9 10 11 13 14 15 16 |
Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete