SECTION 01710
CLEANUP AND RESTORATION
PART 1 - GENERAL
1.1 Section Includes
A. This item shall include the requirements for cleaning and restoring areas and facilities disturbed by construction operations.
B. This item identifies work that may be required on temporary surfacing, or permanent pavement replacement of any public street or roadway disturbed during construction operations. This work will be performed and payment made in accordance with other sections of these Specifications.
1.2 Related Sections
A. Section 01560 - Temporary Controls: Progress cleanup.
B. Section 01700 - Contract Closeout Procedures: Final Cleaning.
C. Section 02222 - Excavation.
D. Section 02223 - Backfilling.
E. Section 02660 - Water Distribution System.
F. Section 02730 - Sanitary Sewerage System.
G. Section 02765 - Sanitary Sewer Mnahole Rehabilitation
H. Section 02766 - Relining Sanitary Sewers
1.3 Requirements
A. The Contractor shall not allow the site(s) of the Work to become littered with trash and waste material, but shall maintain the same in a neat and orderly condition throughout the construction period. The Engineer shall determine what is or is not waste material and the time, place and manner of the disposal of the same.
B. The Contractor's method for disposal of trash and waste shall not cause damage or create a nuisance to other public or private property.
C. The Contractor shall keep the construction site(s) clean and remove surplus and discard materials, temporary structures, stumps, and portions of trees and debris of any kind. He shall leave the site of the Work in a neat and orderly condition, similar or equal or equal to that prior to construction.
D. Cleanup and Restoration operation shall be concurrent with the construction operation and shall be completed before final acceptance by the Owner. The Contractor shall replace with like and kind any trees, shrubbery, fences, culverts, bridges, houses, or buildings and all water, sewer, gas, telephone and electrical lines thereto, and all other private and public property along or adjacent to the Work.
E. The Contractor shall topsoil, rake, fertilize, seed and straw all lawns and grass areas disturbed by construction operations.
F. All private and public property along or adjacent to the Work disturbed by construction operations shall be restored to a condition similar or equal to that existing prior to construction.
G. Before final acceptance by the Owner, the Contractor shall replace and/or restore any water, sewer, drain, and gas lines and appurtenances, electrical, telephone, telegraph conduits and wire, both underground and above ground, and appurtenances; traffic signals, fire and police alarm systems and appurtenances; sidewalks, curb & gutters, drainage ditches and pavements and all other public utility facilities and appurtenances along or adjacent to the Work that may have been disturbed by construction operations.
H. All public utility facilities and appurtenances along or adjacent to the Work disturbed by construction operations shall be restored to a condition similar or equal to that existing prior to construction.
I. Temporary pavement of public streets and roads shall be installed, and additional pavement shall be made as specified in Section 02575 - Pavement Repairs.
J. Permanent pavement replacement of public streets and roads shall be installed and additional payment shall be made as specified in Section 02575 - Pavement Repairs.
K. Gravel, Bituminous and/or concrete driveway and/or parking, parking areas and concrete sidewalks and/or ramp replacement shall be installed; and additional payment shall be made as specified in Section 02575 Pavement Repair.
L. Contractor's attention is called to the fact that no additional payment will be allowed under this contract for maintaining the gravel shoulder with crusher stone once the trench has been completely gravel refilled and prior to the shoulder being shot and chipped. Also, no additional payments will be allowed for that portion of the shoulder beyond the trench limits disturbed by construction.
M. Restoration of areas and facilities disturbed by construction operations shall be properly and regularly maintained in a condition similar or equal to that prior to construction during a period of two (2) years after the final acceptance of the Work by the Owner. Any repairs required because of unsatisfactory backfill or defective materials, and workmanship shall be at the expense of the Contractor. Maintenance measures made necessary by ordinary wear and tear shall not be at the expense of the Contractor.
N. Cleanup and restoration of areas and facilities disturbed by construction operations shall be considered and integral part of the excavation or construction work and no separate payment will be allowed therefor except as herein specified.
PART 2 - PRODUCTS
A. Not used.
PART 3 - EXECUTION
A. Not used.
END OF SECTION
|
This Section:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Sections: 1 2 3 4 6 7 8 9 10 11 13 14 15 16 |
Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete