SECTION 01740
WARRANTIES AND BONDS
PART 1 GENERAL
1.01 SECTIONS INCLUDES
A. Preparation and submittal.
1.02 RELATED SECTION
A. Section 002 - Instructions to Bidders: Bid Bonds.
B. Section 009 - Fixed Price Construction: Performance Bond and Labor and Material Payment Bonds, Warranty, and Correction of Work.
C. Section 01700 - Contract Closeout.
D. Section 01730 - Operation and Maintenance Data.
E. Individual Specifications Sections: Warranties required for specific products or Work.
1.03 FORM OF SUBMITTALS
A. Assemble and bind all warranties and bonds in commercial quality, 8-1/2 x 11, binders with hardback, cleanable, plastic covers.
B. Label cover of each binder with printed title WARRANTIES AND BONDS, with title of Project.
C. Page one, type or printed title WARRANTIES AND BONDS, with title of Project, name, address and telephone number of contractor, and name of responsible principal.
D. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project Manual, with each item identified with the number and title of the specification Section in which specified, and the name of the product or work item.
E. Separate each warranty or bond with index tab sheets keyed to the Table of Contents listing. Provide full information, using separate typed sheets as necessary. List Subcontractor, supplier, and manufacturer, with name, address, and telephone number of responsible principal for each.
1.04 PREPARATION OF SUBMITTALS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within ten (10) days after completion of the applicable item or work.
B. Verify that documents are in proper form, contain full information, and are notarized.
C. Retain warranties and bonds until time specified for submittal.
D. Warranties and Bonds shall be available for review by Owner and Engineer as requested.
1.05 TIME OF SUBMITTALS
A. For equipment or component parts of equipment put into service during construction with Owner's permission, submit documents within ten (10) days after acceptance.
B. Make other submittals within ten (10) days of Final Completion.
1.06. FINAL GUARANTY
A. All work shall be and is guaranteed by the Contractor for a period of one year from and after the date of final acceptance of all the Work by the Owner.
If, within said guaranty period, repair or changes are required in connection with guaranteed work which, in the opinion of the Engineer is rendered necessary as the result of the use of materials, equipment or workmanship which are inferior, defective, or not in accordance with the terms of the Contract, the Contractor shall, promptly upon receipt of notice from the Owner and without expense to the Owner:
1. Place in satisfactory condition in every particular all of such guaranteed work, correct all defects therein, and
2. Make good all damage to the building or site, or equipment or contents thereof, which in the opinion of the Engineer, is the result of the use of materials, equipment or workmanship which are inferior, defective, or not in accordance with the terms of the Contract, and
3. Make good any work or materials, or the equipment and contents of building, structure or site disturbed in fulfilling any such guarantee.
B. If the Contractor, after notice, fails within ten (10) days to proceed to comply with the terms of this guaranty, the Owner may have the defects corrected; and the Contractor and his surety shall be liable for all expense incurred, provided, however, that in case of an emergency where, in the opinion of the Engineer, delay would cause serious loss or damage, repairs may be made without notice being given to the Contractors; and the Contractor shall pay the cost thereof.
C. If in order to make required repairs, it is considered necessary by the Contractor that the repairs be made at a manufacturers factory, the Contractor shall pay the cost of removing, crating, shipping, repairing, and reinstalling.
D. All special guarantees or warranties applicable to specific parts of the Work as may be stipulated in the Specifications or other papers forming a part of this contract shall be subject to terms of this paragraph during the first year of the life of each such guarantee.
PART 2 PRODUCTS
A. Not used.
PART 3 EXECUTION
A. Not used.
END OF SECTION
|
This Section:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Sections: 1 2 3 4 6 7 8 9 10 11 13 14 15 16 |
Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete