![]() |
Micro Piles |
Pressure Grouting |
Rock Anchors |
Permeation Grouting |
Micropile
Soil Nailing |
Compaction Grouting |
Micropiles |
Chemical Grouting |
Soil Nail Wall
SECTION 02316
FILTER FABRIC
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. A filter fabric pipe where required around the exterior of the primary tunnel liner or at other locations noted on the Contract Drawings.
1.02 SUBMITTALS
A. Submit the standard manufacturer's catalog sheets and other pertinent information.
PART 2 - PRODUCT
2.01 MATERIALS
A. Provide an engineered fabric commonly used in geotechnical applications.
B. The fabric shall provide a permeable layer or media while retaining the soil matrix.
C. The fabric shall be a nonwoven fabric consisting only of continuous chain polymer filaments or yarns of polyester, formed into a stable network by needle punching. The fabric shall be inert to commonly encountered chemicals and hydrocarbons, shall be mildew and rot resistant, and shall be resistant to ultra-violet light exposure, insects, and rodents. The fabric shall be nonbiodegradable and inert over a pH range of 3 to 12.
D. Properties of Fabric
Properties Value (min) Test Method
Weight 8.0 oz/S.Y. ASTM D 3776
Grab Strength 125 lbs. ASTM D 1682
Elongation at Failure 50 percent ASTM D 1682
Trapezoidal Tear Strength 50 lbs ASTM D 1117
Puncture Strength 50 lbs ASTM D 751
Mullen Burst Strength 250 psi ASTM D 3786
Equivalent Opening Size 70 (1) COE CW-02215 (2)
Water Permeability Coef. (k) 0.1 cm/sec. CFMC GET - 2
(1) U.S. Std. Sieve
(2) COE: Corps of Engineers
E. The fabric shall be wrapped in a protective covering.
2.01 ACCEPTABLE PRODUCTS
Trevira No. 1115 as manufactured by Hoechst or Mirafi No. 140S, or equal.
PART 3 - EXECUTION
3.01 INSTALLATION IN TUNNEL SEWER CONSTRUCTION
A. The use of the filter fabric around the exterior of the primary liner is intended to prevent the migration of soil fines into the excavated tunnel and the resultant creation of voids or settlement.
1. Installation behind ring beams and timber lagging.
a. Filter fabric shall be installed in the tail shield of the tunnel boring machine
b. Filter fabric shall be installed around the exterior of ring beams and timber lagging.
END OF SECTION
|
This Section:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Sections: 1 2 3 4 6 7 8 9 10 11 13 14 15 16 |
Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete