   PART 1 - GENERAL

    01 SECTION INCLUDES

    A. Extent of potable water systems work is indicated on drawings and schedules, and by requirements of this section.

    02 QUALITY ASSURANCE

    A. Manufacturer's Qualifications: Firms regularly engaged in manufacturer of potable water systems materials and products, of types and sizes required, whose products have been in satisfactory use in similar service for not less than 10 years.

    B. Installer's Qualifications: Firm with at least 5 years of successful installation experience on projects with potable water piping work similar to that required for project.

    C. Codes and Standards:

    1. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of potable water system materials and products.

    03 SUBMITTALS

    A. Product Data: Submit manufacturer's technical product data and installation instructions for potable water system materials and products.

    B. Record Drawings: At project closeout, submit record drawings of installed potable water system piping and products, in accordance with requirements of Division 1.

   PART 2 - PRODUCTS

    04 IDENTIFICATION

    A. Underground-Type Plastic Line Markers: Manufacturer's standard permanent, bright-colored, continuous-printed plastic tape, intended for direct-burial service; not less than 6" wide x 4 mils thick. Provide blue tape with black printing reading "CAUTION WATER LINE BURIED BELOW".

    05 PIPES AND PIPE FITTINGS

    A. General: Provide piping materials and factory-fabricated piping products of sizes, types, pressure ratings, and capacities as indicated. Where not indicated, provide proper selection as determined by Installer to comply with installation requirements. Provide sizes and types matching piping and equipment connections; provide fittings of materials which match pipe materials used in potable water systems. Where more than one type of materials or products are indicated, selection is Installer's option.

    06 ACCESSORIES

    A. Anchorages: Provide anchorages for tees, wyes, crosses, plugs, caps, bends, valves, and hydrants. After installation, apply full coat of asphalt or other acceptable corrosion-retarding material to surfaces of ferrous anchorages.

   PART 3 - EXECUTION

    07 INSTALLATION OF PIPE AND PIPE FITTINGS

    A. Copper Tube: Install in accordance with CDA "Copper Tube Handbook".

    B. Ductile-Iron Pipe: Install in accordance with AWWA C600 "Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances".

    C. Steel Pipe: Install in accordance with AWWA C200 "Steel Pipe - Design and Installation".

    D. Polyvinyl Chloride Pipe: Install in accordance with manufacturer's installation instructions.

    E. Polyethylene Pipe: Install in accordance with manufacturer's installation instructions.

    08 INSTALLATION OF VALVES

    A. General: Install valves as indicated with stems pointing up. Provide valve box over underground valves.

    09 ADJUSTING AND CLEANING

    A. Disinfection of Water Mains: Flush and disinfect in accordance with AWWA C651 "Standard for Disinfecting Water Mains".

    END OF SECTION

This Section: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Sections
: 1 2 3 4 6 7 8 9 10 11 13 14 15 16

Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete