    SECTION 03370

    CONCRETE CURING

   PART 1 - GENERAL

   1.01 SECTION INCLUDES

    A. Initial and final curing of horizontal and vertical concrete surfaces.

   1.02 RELATED SECTIONS

    A. Section 03300 - Cast-In-Place Concrete.

   1.03 REFERENCES

    A. ACI 301 - Structural Concrete for Buildings.

    B. ACI 308 - Standard Practice for Curing Concrete.

    C. ASTM C309 - Liquid Membrane-Forming Compounds for Curing Concrete.

   1.04 SUBMITTALS

    A. Submit under provisions of Section 01300.

    B. Product Data: Provide data on curing compounds, product characteristics, compatibility and limitations.

    C. Manufacturer's Installation Instructions: Indicate criteria for preparation and application.

   1.05 QUALITY ASSURANCE

    A. Perform Work in accordance with ACI 301.

    B. Maintain one copy of document on site.

   1.06 DELIVERY, STORAGE, AND HANDLING

    A. Deliver, store, protect and handle products under provisions of Section 01600.

    B. Deliver curing materials in manufacturer's packaging including application instructions.

   PART 2 - PRODUCTS

   2.01 MATERIALS

    A. Membrane Curing Compound Type A: ASTM C309 Type 1-D Class A type, clear with fugitive dye.

    B. Water: Potable and not detrimental to concrete.

   PART 3 - EXECUTION

   3.01 EXAMINATION

    A. Verify substrate conditions under provisions of Section 01039.

    B. Verify that substrate surfaces are ready to be cured.

   3.02 EXECUTION - HORIZONTAL SURFACES

    A. Cure floor surfaces in accordance with ACI 308.

    B. Membrane Curing Compound: Apply curing compound in accordance with manufacturer's instructions in 2 coats with second coat at right angles to first.

   3.03 EXECUTION - VERTICAL SURFACES

    A. Cure surfaces in accordance with ACI 308.

   Membrane Curing Compound: Apply curing compound in accordance with manufacturer's instructions in 2 coats with second coat at right angles to first.

   3.04 PROTECTION OF FINISHED WORK

    A. Protect finished Work under provisions of Section 01500.

    B. Do not permit traffic over unprotected floor surface.

    END OF SECTION

This Section: 1 2 3 4 5 6 7
Sections
: 1 2 3 4 6 7 8 9 10 11 13 14 15 16

Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete