General Construction Specifications

   PART 1 - GENERAL

    01 WORK INCLUDED

    A. Work specified in this section shall comply with the provisions of other Sections of the Specifications.

    B. Pipe and equipment identification and stenciling.

    C. Valve brass identification tags.

   PART 2 - PRODUCTS

   Not Applicable

   PART 3 - EXECUTION

    02 PIPE AND EQUIPMENT IDENTIFICATION AND STENCILING

    A. Identify exposed and concealed piping by stenciling with markings 3/4 inch high for piping 2 inches and smaller and two inches in height for larger piping. Minimum six inch long flow arrows shall designate type of service and direction of flow. In mechanical rooms, powerhouse, fan rooms and similar exposed locations, piping shall be stenciled at valves and intervals not to exceed 25 feet if valves do not occur in that distance. Exposed piping shall be marked at least once in each room. In concealed spaces such as above ceilings, piping shall be stenciled at valves, flanges, unions, elbows and at distances not more than 50 feet apart should no fittings or valves occur. Piping in chases shall be stenciled once at each floor level. Markings shall be easily visible from floor or usual point of vision.

    B. Piping requiring stenciling shall be as follows.

    1. Domestic/Potable Cold Water.

    2. Domestic/Potable Hot Water.

    3. Natural Gas.

    4. Sanitary Waste and Vent.

    5. Compressed air (non-clinical).

    B. Shutoff valves for every type of service shall be securely tagged with a numbered brass valve tag 1-1/2 inches in diameter. A master plan and index list shall be provided showing location and service of each valve and shall be framed and mounted under glass in the mechanical room or other location designated by the Owner, Owner's Representative, or Architect/Engineer.

    C. The following equipment shall be provided with engraved bakelite nameplates attached by rivets, or screws, giving the name of each piece of equipment:

    1. Domestic/Potable Water Heater(s).

    2. Reduced Pressure Backflow Preventers.

    D. Stenciling and/or labeling shall not be performed until painting required under architectural and engineering sections of this specification has been performed.

    END OF SECTION

This Section: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
Sections
: 1 2 3 4 6 7 8 9 10 11 13 14 15 16

Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete