PART 1 - GENERAL
01 WORK INCLUDED
A. Installation of electrical equipment including motor starters, disconnects, control stations, etc., furnished under other Sections and/or furnished by the Owner.
B. Electrical connections to equipment specified under other Sections and/or furnished by Owner.
02 REFERENCES
A. NEMA WD 1 - General Purpose Wiring Devices.
B. NEMA WD 5 - Specific-Purpose Wiring Devices.
PART 2 - PRODUCTS
03 CORDS AND CAPS
A. Straight-blade Attachment Plug: NEMA WD 1, specification grade.
B. Locking-blade Attachment Plug: NEMA WD 5.
C. Attachment Plug Configuration: Match receptacle configuration at outlet provided for equipment.
D. Cord Construction: Oil-resistant thermoset insulated Type SO multiconductor flexible cord with identified equipment grounding conductor, suitable for extra hard usage in damp locations.
E. Cord Size: Suitable for connected load of equipment and rating of branch circuit overcurrent protection.
PART 3 - EXECUTION
04 INSPECTION
A. Verify that equipment is ready for electrical connection, wiring, and energization.
05 PREPARATION
A. Review equipment submittals prior to installation and electrical rough-in. Verify location, size, and type of connections. Coordinate details of equipment connections with supplier and installer.
06 INSTALLATION
A. Use wire and cable with insulation suitable for temperatures encountered in heat-producing equipment.
B. Make conduit connections to equipment using liquid-tight flexible conduit.
C. Install pre-finished cord set where connection with attachment plug is indicated or specified, or use attachment plug with suitable strain-relief clamps.
D. Provide suitable strain-relief clamps for cord connections to outlet boxes and equipment connection boxes.
E. Make wiring connections in control panel or in wiring compartment of pre-wired equipment in accordance with manufacturer's instructions. Provide interconnecting wiring where indicated.
F. Install disconnect switches, controllers, control stations, and control devices such as limit switches and temperature switches. Connect with conduit and wiring as indicated.
END OF SECTION
|
This Section:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Sections: 1 2 3 4 6 7 8 9 10 11 13 14 15 16 |
Rembco Geotechnical Contractors specializes in slope stabilization, foundation repair and support, shoring, grouting, soil nails, micropile installations, and sinkholes. We are experienced in these applications: micro piles, sinkhole repair, permeation grouting, pressure grouting, soil nails, chemical grouting, micropiles, compaction grout, rock anchors and compaction piles. Our specialties are rock anchor, chemical and compaction grouting, mini piles, sinkhole repair, micropiles, and soil nailing. We use a problem-solving approach in the geotechnical portions of buildings, bridges, water plants, sewage plants, tunnels, sinkholes, caisson, and roads. Rembco techniques apply when adding new real estate structures: especially rock anchor, microfine grouting, soil nailing, micropile installations for foundation support. Add URL Construction, Drilling and Concrete